Title: Resolution to authorize the County Manager to execute an agreement with EMCOR Services Betlem for HVAC/Controls/Exhaust fans Installation at the ACC and mod to existing Preventative Maintenance contract to add this equipment
Attachments: 1. Sullivan County Adult Care Center HVAC Proposal 2025
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Narrative of Resolution:

title

Resolution to authorize the County Manager to execute an agreement with EMCOR Services Betlem for HVAC/Controls/Exhaust fans Installation at the ACC and mod to existing Preventative Maintenance contract to add this equipment

 

end

 

body

If Resolution requires expenditure of County Funds, provide the following information:

Amount to be authorized by Resolution: $824,670.00 (a portion of which is over 3 years)

Are funds already budgeted? No

                     If ‘Yes,’ specify appropriation code(s): Click or tap here to enter text.

                     If ‘No,’ specify proposed source of funds: General Fund

Specify Compliance with Procurement Procedures:

N/A

RESOLUTION INTRODUCED BY THE EXECUTIVE COMMITTEE TO AUTHORIZE THE COUNTY MANAGER TO EXECUTE A CONTRACT WITH EMCOR SERVICES BETLEM TO PROVIDE INSTALLATION OF HVAC EQUIPMENT AT THE ADULT CARE CENTER AND TO MODIFY A CONRACT TO ADD THIS EQUIPMENT TO THE FULL-SERVICE PREVENTATIVE MAINTENANCE PROGRAM

 

WHEREAS, the County has completed two energy efficiency projects involving replacement and upgrade of heating, ventilation, and air conditioning (HVAC) equipment and controls in the Government Center, Government Center Annex, Courthouse, and Gladys Olmsted Building through the New York Power Authority; and

 

WHEREAS, health and safety protocols due to the COVID pandemic created the need to pause portions of the HVAC work at the Adult Care Center, as the contractor was not allowed to work at this building at the time of the project; and

 

WHEREAS, the roof top HVAC equipment was engineered and designed specifically for the Adult Care Center facility and was non-returnable, therefore the County accepted delivery and stored this equipment in anticipation of its eventual installation at the facility; and

 

WHEREAS, EMCOR Services Betlem, 6057 Corporate Drive, East Syracuse, NY 13057

was the subcontractor during this project and has previously installed the two units serving the resident wing common spaces; and

 

WHEREAS, Sullivan County Division of Public Works requested a proposal from EMCOR Services Betlem to install the remaining HVAC equipment purchased during the original project, install the controls associated with this equipment, and replace the exhaust fans throughout, as they have exceeded their useful lives.  The County also requested a proposal for adding this equipment to the existing Full-Service Preventative Maintenance Contract with EMCOR Services Betlem.  After review of the proposal, DPW recommends entering into said agreements; and

 

WHEREAS, the total not to exceed cost to the County is $824,670.00, per the proposal, for the installation of HVAC equipment/controls/exhaust fans and the modification to the full-service contract. 

 